KPJV is a JV made up of four partners who are Fluor, Worley, KGNT and KING.
Together we support TCO - FGP/WPMP project.
The Future Growth Project and the Wellhead Pressure Management Project are another major expansion projects for Tengiz that will increase production of crude oil by 12 million tonnes per year.

Future Growth Project(FGP) is based on TCO’s highly-successful Sour Gas Injection-Second Generation Project (SGI-SGP) expansion project.Executed together with FGP the Wellhead Pressure Management Project (WPMP) will keep production at current levels through a pressure boost facility that will maintain pressure in the Tengiz reservoir.

FGP and WPMP will be designed, built and operated in an environmentally responsible manner and will bring significant economical benefit to the Kazakhstani economy through creation of new jobs and large-scale use of local goods and services.

Tengiz Overview

  • Deepest developed super – giant oil field
  • Reservoir – 20 km x 21 km
  • Oil column – 1600 m
  • Geological reserves of oil – 26 billion barrels
  • Sour gas – 13% (H2S)

Tengiz is located on the 2,500 square kilometre (1,600 square mile) project license area which includes the super giant Tengiz field, and a smaller but sizable Korolev field and several exploratory prospects.

The Tengiz and Korolev fields have potential for an estimated 750 million to 1.1 billion metric tonnes (6 billion to 9 billion barrels) of recoverable oil. Estimated original oil in place in the drilled and un portions of Tengiz field is about 3 billion metric tonnes (26 billion barrels). At a world class size of 190 million metric tonnes (1.5 billion barrels), Korolev is one-sixth the size of Tengiz.

Tengiz field is one of the world's deepest developed super giant oil fields, with the top of the reservoir at about 4,000 meters (13,000 feet). Tengiz reservoir is 19 kilometres (12 miles) wide by 21 kilometres (13 miles) long. The oil column measures an incredible one mile thick. The reservoir area is so large that one would have to run nearly two marathons to cover the entire distance around it.

Вакансии компании «KPJV» 

Вакансии в текущем регионе: Казахстан3

 
з/п не указана
Атырау
з/п не указана
Атырау
 
ТОО KPJV, 14 сентября 
з/п не указана
Атырау